WAS`SUP

WAS'SUP AT OUR HOUSE - APRIL/2018

April is fast getting away from me, so let me quickly post my blog, so I can check it off the list (wink).  Quite a busy month, with Creativ being early... but I have some MOMENTUS news to share... while we DID buy a house in Campbell River... Bill accepted a job that will put him back on a 3-week on / 3-week off schedule... which means we don't have to move (!!!), so we are now selling a house in BC, ROFLOL.  This happened the night before we set up for the Creativ in Toronto, so everyone who came to that show already heard the good news, LOL.

And we didn't forget about the house renovations here in all the excitement, as I also have my BIL working hard on the library stairs... between us we have the posts in place (him), the extra layer of wood on the treads (him), the actual flooring on the treads (a bit him, but mostly me), and the non-slip rubber bullnose in place (me)... I'm hoping that next month I can show you a pic of the hand-rails and spindles (fingers crossed).

But I haven't been idle in the kitchen either!  Changing the layout before we ordered the counter-tops left 3 wee holes drilled in my hardwood floor - RIGHT where you enter the kitchen (sigh).  To fix this it was necessary to pull the hardwood floor up in a large V, since it was all interlocked, and I finally got that done and re-laid the floor, and also put in those floor join strips at the doorways where the kitchen and library meet the diningroom.  Unfortunately, after 6 hours work, it looks like that's all I did, LOL, unless you knew the holes were there and notice they are now gone!

I also got the last faux-wall done, to form the 'fridge garage' ... you know what I mean, LOL, not an actual wall, but that board that hides the side of your fridge and holds up one end of the wee cupboard over the fridge?  I built a small space for a broom attached to that 'wall', then got my china cabinet (which is made to be built in) in place with it's back to the fridge, attaching it to the actual wall (that runs behind the fridge) on one side, and anchored to that 'faux' wall too.  Kind of hard to picture, so maybe I'll post some pics next month...

AND I got the half-wall built (sort of), that hides the counter between the kitchen and diningroom... basically I attached a piece of melamine to the back of the cupboards, that fits the back side of the width and stands about 6" taller.  I anchored additional supports on the kitchen side, wood that is attached to both the 'wall' and the countertop.  I still have to put a narrow (6" tall) piece of drywall on the kitchen side, so I can finish my backsplash tiling, and cut / sand / paint the wide board for the top of the wall, ... but it's starting to look a lot more finished (yea!). 

I'm working on month-end projects for the next few days, so won't get that done this month... but I'm hoping to get the tiling done next week, before Bill comes home (as a surprise for him - if he DN read my blog (wink))... and maybe I'll get the last of the handles on the doors of the pantries in the laundry room too... but I still have to finish crocheting a pair of SHARK BOOTIES for my new grandbaby (we leave for England on the 8th to meet her)... so lots to do in a very short time!

I'll catch you next month, and hopefully have lots of progress to report - as well as news of our trip!  L8R!

 

Search

Meet The Team

We had to buy...

Monthly E-Newsletter

If you would like to receive our monthly E-Newsletter, please sign up here.

Select your Birthday Month to be entered in a draw to receive a special something for your birthday.

Birthday Month
captcha